Foothills Outlet

Zak was contracted to remove a siphon structure that was severely damaged by the flood, and then rebuild the outlet ditch. The new siphon structure was constructed and 240’ of the outlet ditch was put into a pipe. Existing outlet ditch was also removed and rebuilt.

Location: Hygiene, CO
Contract Amount: $150,000.00
Start Date: 1/31/2014
Completion Date: 2/27/2014