104th Avenue Widening Phase 3B
Improvements to widen East 104th Avenue from US Highway 85 to Lima Street to include: demolition, earthwork, concrete and some asphalt pavement, reconstruction of the Union Pacific Railroad crossing, curb and gutter, sidewalk, a new I-76 overpass and modifications to the existing overpass, new O’Brian Canal bridges, extension of the Burlington Ditch box culvert, pedestrian underpass, traffic signals, interconnect conduit, traffic control, storm sewer, retention ponds, sanitary sewer, potable and non-potable waterlines.
Location: Commerce City, CO |
see below to scroll through photos & enlarge
|
-
Click to enlarge Pedestrian Underpass
11/11/2015
-
Click to enlarge O'Brien Canal Bridge
11/11/2015
-
Click to enlarge Fire Line Vault Installation at 104th Avenue
2/27/2015
-
Click to enlarge Intersection Paving at 104th Avenue
2/27/2015
-
Click to enlarge Precast box culvert at 104th Avenue
2/27/2015
-
Click to enlarge Columns on I-76 Bridge at 104th Avenue
2/27/2015
-
Click to enlarge Pull Tarps Intersection Prep
2/27/2015
-
Click to enlarge H-Pile Installation on 104th Avenue
2/27/2015
-
Click to enlarge 104th Sidewalk Prep
2/27/2015
-
Click to enlarge 104th Avenue Type 7 Guardrail
2/27/2015
-
Click to enlarge Asphalt on Florence Street
2/27/2015
-
Click to enlarge Bridge Deck Pour at 104th
10/17/2014
-
Click to enlarge Box Culvert Installation at 104th Avenue
11/19/2014
-
Click to enlarge Finishing the Concrete Paving at 104th
11/19/2014
-
Click to enlarge Railroad Signal Improvements
11/19/2014
-
Click to enlarge Concrete Paving at 104th Avenue
10/17/2014
-
Click to enlarge Installation of Bridge Girders at 104th
10/17/2014
-
Click to enlarge Bridge Girders at 104th
10/7/2014
-
Click to enlarge Bridge Girders at 104th
10/7/2014
-
Click to enlarge Bridge Girders at 104th
10/7/2014
-
Click to enlarge Bridge Girders at 104th
10/7/2014
-
Click to enlarge Bridge Girders at 104th
10/7/2014
-
Click to enlarge Precast box culvert
10/7/2014
-
Click to enlarge Precast box culvert
10/7/2014
-
Click to enlarge Bridge Pier at 104th Avenue
10/7/2014
-
Click to enlarge Waterline along Florence Street
5/25/2014
-
Click to enlarge Heavy equipment at 104th Avenue
5/25/2014
-
Click to enlarge Drilling caissons at 104th Avenue
5/25/2014
-
Click to enlarge Drilling caissons at 104th Avenue
5/25/2014
-
Click to enlarge Driving piling at 104th
5/25/2014
-
Click to enlarge Bridge construction at 104th Avenue
5/25/2014