Crow Lane Reservoir

Construction of a new 50’ high dam. A portable concrete batch plant was set-up onsite to produce the approximately 4,000 cubic yards of 4500 psi concrete needed to construct the Labyrinth Spillway, as well as supplying dental concrete and concrete for the associated outlet works. A clay liner was installed on the upstream face to remediate any possible future leakage that may occur.

Location: Pinewood Springs, CO
Owner: Pinewood Springs Water District
Contract Amount: $2,116,118.00
Start Date: 2/29/2008
Completion Date: 10/30/2009