Sheridan Avenue Bridge Over BNSF and UP Railroad
The project will replace an existing bridge on Sheridan Blvd that travels over the BNSF and UP railroad tracks. Work will be done in two phases and include the addition of sidewalks on the bridge, drainage work, and precast panel walls. The bridge will be lengthened to allow for future RTD FasTracks to go underneath the bridge.
Location: Arvada, CO |
see below to scroll through photos & enlarge
|
-
Click to enlarge Sheridan Avenue Bridge
10/5/2013
-
Click to enlarge Sheridan Avenue Bridge, Concrete Panels
10/5/2013
-
Click to enlarge Sheridan Avenue Bridge
10/5/2013
-
Click to enlarge Sheridan Avenue Bridge
10/5/2013
-
Click to enlarge Sheridan Avenue Bridge
10/5/2013
-
Click to enlarge Sheridan Bridge South Wall
8/14/2013
-
Click to enlarge Sheridan Bridge North Wall
8/14/2013
-
Click to enlarge Sheridan Bridge
6/13/2013
-
Click to enlarge Sheridan Bridge Girder Setting
1/8/2013
-
Click to enlarge Setting Girders at Sheridan Bridge
1/3/2013
-
Click to enlarge Crane & Counter Weights
1/8/2013
-
Click to enlarge Center Piers at Sheridan Bridge
1/8/2013
-
Click to enlarge Precast Panels at Sheridan Bridge
1/8/2013
-
Click to enlarge Sheridan Bridge Over BNSF and UP Railroad
1/3/2013
-
Click to enlarge 54” caisson rebar cage
11/10/2012
-
Click to enlarge Drilling for Caissons South Abutment
11/10/2012
-
Click to enlarge Sheridan Blvd Bridge Over the Railroad
6/7/2012
-
Click to enlarge Sheridan Avenue Bridge
10/5/2013