Highland Headgate Structure

Due to the flood in Lyons, the headgate structure for the Highland ditch system in the Saint Vrain River was wiped out. Zak Dirt was asked to work as part of a design/build team to accelerate the reconstruction of this project.

Location: Lyons, CO
Owner: Highland Ditch Company
Start Date: 9/29/2013
Completion Date: 12/30/2013






see below to scroll through photos & enlarge
 

Project Updates:

This project was completed February 5th and is currently in operation. Project consisted of 500 cubic yards of structural concrete with reinforcing steel, structural steel, reconstructing the outlet canal, dewatering, riprap and other miscellaneous Items. Project was completed on time.

Updated By: zak pm

As always, weather or encountering unknown conditions may cause unforeseen delays to the construction schedule. Every effort will be made to inform you and keep you apprised of changes.