Zak Dirt projects demonstrate our record for high standards and excellent results. Zak Dirt has been honored with several prestigious awards including:
Project Management Awards
|
Gold Hard Hat Awards
Safety Awards
|
Zak Dirt projects demonstrate our record for high standards and excellent results. Zak Dirt has been honored with several prestigious awards including:
Project Management Awards
|
Gold Hard Hat Awards
Safety Awards
|
Replacement of the existing outlet works with a new 30” diameter welded steel pipe and gate. The reservoir capacity was enlarged by raising the dam crest approximately 2’. The existing spillway was deemed inadequate by the State Engineer and was rebuilt using 2,100 square yards of Armourflex Cellular Concrete Mats as erosion protection. Location: Westminster, CO |
Replacement of the existing bridge across the Platte River. The substructure of the new bridge consisted of drilled 54” caissons for pier support and steel H-pile driven for abutment support. Approximately 12,000 square feet of retaining wall was built to facilitate widening the south side of Highway 7. Location: Brighton, CO |
Construction of a new 50’ high dam. A portable concrete batch plant was set-up onsite to produce the approximately 4,000 cubic yards of 4500 psi concrete needed to construct the Labyrinth Spillway, as well as supplying dental concrete and concrete for the associated outlet works. A clay liner was installed on the upstream face to remediate any possible future leakage that may occur. Location: Pinewood Springs, CO |
Replacement of (2) bridges over Redstone Creek and the Hanson Canal. Realignment and construction of new roadway and (3) rip rap drop structures in Larimer County. Location: Masonville, CO |